Proof of concept (POC) success criteria tracker

Score POC criteria as met or not met against targets, with weighted results, must-haves, milestones and a recommendation.

Create an account

Downloads are included in the $19.85 yearly membership. Sign in

XLSXCSVODSXMLNumbers
POC success scorecard
Example data — replace the blue input cells with your own.
CRITERIA MET (OF TESTED)WEIGHTED SCOREMUST-HAVES NOT METDAYS REMAINING
60%65.7%142
Example: fictional data integration proof of concept for Example Manufacturing Co.
Dates
POC start dateSep 14, 2026First day of the proof of concept
POC end date (readout)Nov 20, 2026Date of the go or no-go readout
Status as ofOct 9, 2026Change this date to re-score the timeline
Days remaining42Negative means the end date has passed
Share of the POC period elapsed37%
Results
Criteria in the list12
Met6

Showing the first 16 of 38 rows and 4 of 4 columns. Cells with formulas show the formula on hover.

What does this template do?

This tracker keeps the success criteria for a proof of concept in one place, so the go or no-go decision rests on numbers agreed at the start. Each criterion has a category, a metric, a unit, a target, a direction (higher or lower is better), a weight, a must-have flag and an owner. Enter the measured actual value when a test is complete; a blank actual shows Not tested.

Status compares the actual with the target in the stated direction and returns Met or Not met. The Scorecard tab counts the criteria met, gives the weighted score as points earned divided by the weight of the tested criteria, and counts the must-have criteria that are not met. It shows the days left to the end date and a recommendation: At risk when a must-have is not met, Incomplete when criteria are untested, and On track otherwise. The Timeline tab compares planned and actual milestone dates with the status date.

The example is a fictional data integration proof of concept for Example Manufacturing Co. Its criteria, targets and results are illustrative. Agree the criteria and targets with the customer before testing starts.

What’s inside

  • Status by direction: Met or Not met against the target, and Not tested while the actual is blank
  • Weighted score as points earned divided by the weight of the tested criteria
  • Must-have failures flagged, and the recommendation changes to At risk
  • Planned and actual dates for eight milestones, with slip in days and status
  • Room for 50 criteria, with days remaining and the share of the POC period elapsed

Which tabs does the workbook have?

TabWhat it holds
ScorecardDates, KPI tiles, criteria met, weighted score, must-haves, the recommendation and results by category.
CriteriaOne row per criterion with target, actual, direction, weight, status, points and must-have failures.
TimelinePlanned and actual milestone dates with slip in days and status.
NotesPurpose, steps, formulas used, assumptions and limits.

What formulas does this template use?

This template holds 280 formulas in 522 cells across 4 tabs, so 54% of its cells calculate. They use 11 distinct functions; the longest formula is 188 characters and 50 of them read from another tab.

FunctionUsesWhat it does
IF754one result when a test is true, another when false
AND50true when every test is true
OR50true when any test is true
COUNTIFS16counts cells meeting several conditions
MAX16largest value
COUNTIF11counts cells meeting one condition
SUM7adds numbers
COUNTA2counts non-empty cells
SUMPRODUCT2multiplies matching entries, then adds them
MIN1smallest value
SUMIF1adds values meeting one condition

Counted from the workbook itself. Only functions that Excel, LibreOffice Calc, Google Sheets and Apple Numbers evaluate the same way are used, so the formulas survive every download format.

How do you use it?

  1. On the Criteria tab, agree each criterion, its target, direction, weight and must-have flag with the customer.
  2. Enter the actual value for each criterion when its test is complete.
  3. On the Scorecard tab, enter the POC start date, end date and status date.
  4. Read the criteria met, weighted score, must-haves not met and the recommendation.
  5. Enter actual milestone dates on the Timeline tab as they happen.

What is it good for?

  • Tracking a data integration or software pilot against agreed criteria
  • Presenting a go or no-go readout with a weighted score
  • Showing a customer which must-haves are still open
  • Planning test windows against milestone dates

Questions about this sheet

How is a criterion marked Met?

A higher-is-better criterion is Met when the actual is at least the target. A lower-is-better criterion is Met when the actual is at most the target. A blank actual is Not tested.

What does the weighted score measure?

It is the points earned by met criteria divided by the total weight of the tested criteria. Untested criteria count toward neither the points nor the weight.

When does the recommendation say At risk?

It says At risk: must-have not met when any must-have criterion is Not met, even if other criteria are untested. It says Incomplete when criteria are untested and no must-have has failed.

Can the status date be changed to test a later point?

Yes. The status date drives days remaining, the share of the POC elapsed and the overdue status on the Timeline tab. Results still come from the actual values entered.