Progress billing and retainage tracker
Calculate work earned to date, retainage withheld, and current net payment due across schedule-of-values line items.
Downloads are included in the $19.85 yearly membership. Sign in
XLSXCSVODSXMLNumbers| Progress billing and retainage tracker | ||||||||
| Example data — replace the blue input cells with your own. | ||||||||
| Calculate work earned to date, retainage withheld, and current net payment due across schedule-of-values line items. | ||||||||
| Populated records | 6 | Prepared capacity used | 10.0% | |||||
| Total current payment due (USD) | $104,175.00 | Peak: Current payment due (USD) | $27,000.00 | |||||
| Average: Current payment due (USD) | $17,362.50 | |||||||
| Active rows bar | ██ | |||||||
| 60 record rows (6 sample rows shown). Blue cells are inputs; dark cells calculate. | ||||||||
| Work package | Scheduled value (USD) | Completed share | Retainage rate | Prior net billed (USD) | Earned to date (USD) | Retainage held (USD) | Current payment due (USD) | Scale bar |
| 03 Concrete work | $100,000.00 | 60.0% | 10.0% | $36,000.00 | $60,000.00 | $6,000.00 | $18,000.00 | ████████ |
| 05 Structural steel | $80,000.00 | 50.0% | 10.0% | $20,000.00 | $40,000.00 | $4,000.00 | $16,000.00 | ███████ |
| 09 Interior finishes | $60,000.00 | 25.0% | 10.0% | $0.00 | $15,000.00 | $1,500.00 | $13,500.00 | ██████ |
| 03 Concrete work (4) | $150,000.00 | 60.0% | 10.0% | $54,000.00 | $90,000.00 | $9,000.00 | $27,000.00 | ████████████ |
| 05 Structural steel (5) | $64,000.00 | 50.0% | 10.0% | $16,000.00 | $32,000.00 | $3,200.00 | $12,800.00 | ██████ |
| 09 Interior finishes (6) | $75,000.00 | 25.0% | 10.0% | $0.00 | $18,750.00 | $1,875.00 | $16,875.00 | ████████ |
Showing the first 16 of 72 rows and 9 of 9 columns. Cells with formulas show the formula on hover.
| Progress billing and retainage tracker |
| Method, inputs, and limits for this workbook. |
| What it does |
| Calculate work earned to date, retainage withheld, and current net payment due across schedule-of-values line items. |
| How to use it |
| Replace the fictional records in blue cells with your own data. Keep the dark formula cells. Use the units stated in the column headers and keep each record on one row. Read the calculated columns and inspect the results before using them.… |
| Formulas and method |
| Earned to date multiplies scheduled value by completed share. Retainage held multiplies earned amount by the retainage rate, and current payment due subtracts retainage held and prior net billings from earned to date. |
| Assumptions and limits |
| Stored materials, change orders, and partial retainage releases are excluded unless incorporated into the scheduled value and completion percentage. |
| Missing numeric inputs |
Showing the first 16 of 72 rows and 4 of 4 columns. Cells with formulas show the formula on hover.
What does this template do?
Calculate work earned to date, retainage withheld, and current net payment due across schedule-of-values line items.
Earned to date multiplies scheduled value by completed share. Retainage held multiplies earned amount by the retainage rate, and current payment due subtracts retainage held and prior net billings from earned to date.
Stored materials, change orders, and partial retainage releases are excluded unless incorporated into the scheduled value and completion percentage.
The working tab keeps editable inputs separate from formulas, with 6 populated sample rows, summary KPIs, an in-cell scale bar, and room for 60 records. The Notes tab explains the method and how to extend the range. All example records are fictional and can be replaced. Download a workbook format to retain formulas, or CSV when you need calculated values only.
What’s inside
- Earned to date multiplies scheduled value by completed share. Retainage held multiplies earned amount by the retainage rate, and current payment due subtracts retainage held and prior net billings from earned to date.
- 60 prepared record rows with blank-row guards and in-cell scale bars
- Summary KPI block with peak, average, and capacity tracking
- Blue input cells, typed dates and numbers, and frozen column headers
- Notes with the method, assumptions, and range-extension instructions
Which tabs does the workbook have?
| Tab | What it holds |
|---|---|
| Worksheet | Calculate work earned to date, retainage withheld, and current net payment due across schedule-of-values line items. |
| Notes | How to use the workbook, formula method, assumptions, and file format limits. |
What formulas does this template use?
This template holds 246 formulas in 313 cells across 2 tabs, so 79% of its cells calculate. They use 13 distinct functions; the longest formula is 134 characters.
| Function | Uses | What it does |
|---|---|---|
IF | 484 | one result when a test is true, another when false |
COUNT | 182 | counts numeric cells |
MAX | 182 | largest value |
OR | 120 | true when any test is true |
MIN | 61 | smallest value |
REPT | 61 | repeats text |
ROUND | 61 | rounds to a number of digits |
ISNUMBER | 60 | true for a number |
NOT | 60 | reverses true and false |
COUNTA | 4 | counts non-empty cells |
COUNTIF | 2 | counts cells meeting one condition |
AVERAGE | 1 | mean of numbers |
The 12 most used of 13 functions. Counted from the workbook itself. Only functions that Excel, LibreOffice Calc, Google Sheets and Apple Numbers evaluate the same way are used, so the formulas survive every download format.
How do you use it?
- Replace the fictional records in blue cells with your own data. Keep the dark formula cells.
- Use the units stated in the column headers and keep each record on one row.
- Read the calculated columns and inspect the results before using them. Clear unused input rows; keep their formulas.
- The prepared range holds 60 records in rows 11–70. Extend formulas and summary ranges together if you add more rows.
What is it good for?
- Calculate work earned to date, retainage withheld, and current net payment due across schedule-of-values line items
- Replacing the labeled fictional records with your own figures
- Checking a calculation before adapting it to a larger workbook
Questions about this sheet
How is the result calculated?
Earned to date multiplies scheduled value by completed share. Retainage held multiplies earned amount by the retainage rate, and current payment due subtracts retainage held and prior net billings from earned to date.
What assumptions should I check?
Stored materials, change orders, and partial retainage releases are excluded unless incorporated into the scheduled value and completion percentage.
Can I add more than 60 records?
Yes. Copy the formula columns into new rows and extend every summary range to include them. Keep inputs and formulas in their original columns.
Are the example records real?
No. All example data is fictional and intended to demonstrate the formulas. Replace it before using the workbook for your own work.