A 42-circuit 208Y/120 V panel schedule with phase totals, NEC 220.44 receptacle demand and current.
Preview below without an account. Downloads require the $19.85 yearly membership. Already registered? Sign in. XLSX, ODS and XML keep formulas; CSV and Numbers contain values only.
XLSXCSVODSXMLNumbers| Electrical panel load schedule | ||||||||||
| Example data — replace the blue input cells with your own. | ||||||||||
| Circuit | Description | Load type | Poles | Phase | Connected load (VA) | Demand load (VA) | Phase A (VA) | Phase B (VA) | Phase C (VA) | Breaker (A) |
| 1 | Lighting, corridor north | Lighting | 1 | C | 1,440 | 1,440 | 0 | 0 | 1,440 | 20 |
| 2 | Lighting, corridor south | Lighting | 1 | A | 1,440 | 1,440 | 1,440 | 0 | 0 | 20 |
| 3 | Lighting, open office | Lighting | 1 | C | 2,640 | 2,640 | 0 | 0 | 2,640 | 20 |
| 4 | Lighting, classrooms | Lighting | 1 | A | 2,880 | 2,880 | 2,880 | 0 | 0 | 20 |
| 5 | Lighting, library | Lighting | 1 | B | 2,160 | 2,160 | 0 | 2,160 | 0 | 20 |
| 6 | Lighting, gymnasium | Lighting | 1 | B | 3,360 | 3,360 | 0 | 3,360 | 0 | 20 |
| 7 | Lighting, kitchen | Lighting | 1 | C | 1,200 | 1,200 | 0 | 0 | 1,200 | 20 |
| 8 | Lighting, offices | Lighting | 1 | A | 1,920 | 1,920 | 1,920 | 0 | 0 | 20 |
| 9 | Lighting, exterior and car park | Lighting | 1 | C | 1,800 | 1,800 | 0 | 0 | 1,800 | 20 |
| 10 | Lighting, stairs and lobby | Lighting | 1 | A | 1,320 | 1,320 | 1,320 | 0 | 0 | 20 |
| 11 | Receptacles, lobby | Receptacle | 1 | C | 1,920 | 1,248 | 0 | 0 | 1,248 | 20 |
| 12 | Receptacles, reception | Receptacle | 1 | B | 1,440 | 936 | 0 | 936 | 0 | 20 |
Showing the first 16 of 49 rows and 11 of 11 columns. Cells with formulas show the formula on hover.
| Panel summary, NEC 220.44 receptacle demand and current | |||
| Blue cells are the panel data and the demand settings. Everything else is calculated from the Schedule tab. | |||
| Panel | |||
| Panel name | Example Panel LP-1 | ||
| System voltage, line to line (V) | 208 | 208Y/120 V, three-phase, four-wire | |
| Main breaker rating (A) | 400 | ||
| Circuits scheduled | 42 | ||
| Receptacle demand (NEC 220.44, other than dwelling units) | |||
| Connected receptacle load (kVA) | 33.36 | ||
| First block, taken at 100% (kVA) | 10.0 | ||
| Demand factor for the remainder | 50% | NEC 220.44: first 10 kVA at 100%, remainder at 50% | |
| Receptacle demand (kVA) | 21.68 | ||
| Demand ratio applied to each receptacle circuit | 0.6499 | ||
| Demand reduction on receptacles (kVA) | 11.68 |
Showing the first 16 of 47 rows and 4 of 4 columns. Cells with formulas show the formula on hover.
| Electrical panel load schedule |
| Notes: what this workbook does, how to use it and the method behind it. |
| What it does |
| A 42-circuit schedule for a 208Y/120 V, three-phase, four-wire panel. Each circuit has a load type, number of poles and phase, connected load and breaker size. The sheet applies the NEC 220.44 receptacle demand, totals the phases, shows th… |
| How to use it |
| 1. On the Summary tab, enter the panel name, voltage, main breaker rating and the demand settings if they differ from the defaults. |
| 2. On the Schedule tab, replace the example descriptions and connected loads with your own. Keep one row per circuit. |
| 3. Choose the load type from the list. Receptacle circuits receive the NEC 220.44 demand ratio; all other loads count at their connected value. |
| 4. Single-pole circuits go on phase A, B or C. Two-pole circuits go on AB, BC or CA. Three-pole circuits go on ABC. |
| 5. Read the phase demand, the imbalance and the total kVA and amps on the Summary tab. Check the two check cells say OK. |
| Formulas and method |
| Receptacle demand (NEC 220.44, other than dwelling units): the first 10 kVA of connected receptacle load at 100%, and the rest at 50%. The demand ratio = demand ÷ connected receptacle load is applied to every receptacle circuit, so the pha… |
| Phase split: a single-pole circuit adds its demand to its phase. A two-pole circuit adds half its demand to each of its two phases. A three-pole circuit adds a third to each phase. |
Showing the first 16 of 33 rows and 1 of 1 columns. Cells with formulas show the formula on hover.
What does this template do?
This schedule lists 42 circuits on a 208Y/120 V, three-phase, four-wire panel and checks the connected load against the main breaker. Each circuit has a description, load type, number of poles, phase, connected load and breaker size. The example panel is fictional and carries lighting, receptacle, HVAC and equipment loads.
The Summary tab applies the NEC 220.44 receptacle demand: the first 10 kVA of connected receptacle load at 100% and the remainder at 50%. The demand is spread across the receptacle circuits in proportion to their connected load. Single-pole circuits sit on one phase, two-pole circuits split evenly across two phases, and three-pole circuits split across all three.
The sheet totals each phase, reports the largest deviation from the average as the phase imbalance, and calculates the total current as kVA × 1000 ÷ (√3 × 208 V). Every result is labelled as a value to verify. The workbook adds up loads; it does not size conductors, breakers or feeders.
What’s inside
- 42 circuits, each with load type, poles, phase, connected load and breaker size
- NEC 220.44 receptacle demand: first 10 kVA at 100%, remainder at 50%, applied to each receptacle circuit
- Phase totals from pole count: single-pole on one phase, two-pole on AB, BC or CA, three-pole on ABC
- Imbalance = largest deviation from the average phase ÷ the average
- Total amps = kVA × 1000 ÷ (√3 × 208), compared with the main breaker rating
Which tabs does the workbook have?
| Tab | What it holds |
|---|---|
| Schedule | Circuit list with description, load type, poles, phase, connected load, demand, phase split and breaker size. |
| Summary | Panel settings, receptacle demand, load by type, phase balance, total kVA and current, and checks. |
| Notes | What the workbook does, how to use it, the demand and phase method, the limits and the professional-verification note. |
What formulas does this template use?
This template holds 213 formulas in 604 cells across 3 tabs, so 35% of its cells calculate. They use 9 distinct functions; the longest formula is 82 characters and 62 of them read from another tab.
| Function | Uses | What it does |
|---|---|---|
IF | 555 | one result when a test is true, another when false |
OR | 126 | true when any test is true |
SUM | 15 | adds numbers |
SUMIF | 13 | adds values meeting one condition |
ABS | 5 | absolute value |
MAX | 2 | largest value |
COUNT | 1 | counts numeric cells |
MIN | 1 | smallest value |
SQRT | 1 | square root |
Counted from the workbook itself. Only functions that Excel, LibreOffice Calc, Google Sheets and Apple Numbers evaluate the same way are used, so the formulas survive every download format.
How do you use it?
- On the Summary tab, enter the panel name, the voltage and the main breaker rating.
- On the Schedule tab, replace the example circuits with your own, one row per circuit.
- Choose the load type, poles and phase for each circuit from the drop-down lists.
- Read the receptacle demand, phase totals and imbalance on the Summary tab.
- Check the total current against the main breaker and confirm the check cells say OK.
What is it good for?
- Preparing a first load schedule for a commercial or institutional panel
- Checking phase balance before a panel is wired
- Testing how the NEC 220.44 receptacle demand changes the total
- Teaching how loads are split across three phases
Questions about this sheet
Does the sheet size breakers and conductors?
No. It adds up loads and shows the current. Conductor sizing, breaker coordination, voltage drop and feeder design need a separate calculation by a licensed engineer.
Why is the receptacle demand lower than the connected load?
NEC 220.44 allows the first 10 kVA of connected receptacle load at full value and half of the remainder. The reduction is shown on the Summary tab.
How are two-pole and three-pole circuits counted by phase?
A two-pole circuit on AB adds half its demand to phase A and half to phase B. A three-pole circuit adds a third of its demand to each phase.
Can I use the results on a permit submission?
Not as they stand. Confirm the calculation against the adopted NEC edition and local amendments, and have a licensed electrical engineer check it first.